Capital Improvement

Current Projects

Check out our Capital Projects to see how we’re investing in the future of your water system. These projects ensure safe, reliable water service by upgrading infrastructure, improving efficiency, and meeting the needs of our growing community. A strong water system today means dependable service tomorrow.

Explore Our Current Capital Improvement Projects



Water system work was completed in the Fall of 2024.  Permanent pavement restoration will be performed in the Spring of 2025.

Easton Suburban Water Authority is working to complete the design of a project in the South Side area of Easton to replace the existing cast iron water mains with new 8” ductile iron water mains.  The project will consist of the replacement of the watermains and the replacement or reconnection of the water service laterals.  Existing copper water service laterals will be connected to the new water mains and any lead service laterals that are found will be replaced between the new water main and the curb stop.  Test holes will be excavated on the curb stops in April and May of 2025 to confirm the water service lateral material on both sides of the curb stop.  The project will be bid in the Summer of 2025 with construction anticipated to begin in the Fall of 2025.

Work should be completed in the Spring of 2026.

The work is planned on the following streets:

  • Lachenour Avenue (Madison Street to Charles Street)
  • East Madison Street (Lachenour Avenue to Ann Street)
  • Folk Street (Cooper Street to East Madison Street)
  • East St. Jospeh Street (Folk Street to Ann Street)
  • Charles Street (East Madison Street to Lachenour Avenue)
  • James Street (East Madison Street to Lachenour Avenue)

Easton Suburban Water Authority is finalizing design of a project to replace the existing 10” cast iron water main on Tatamy Road between Hackett Avenue and Walter Road in Palmer Township.  The project will also include the installation of a new water main crossing of the Bushkill Creek near the Bushkill Park Drive Bridge.  The design of the project will be completed in the Spring of 2025, with the project being bid in the Summer of 2025 and construction being performed in the Fall of 2025.

2025 South Side Water System Improvements (Change to South Side Water System Improvements West)

Easton Suburban Water Authority is working to complete the design of a project in the South Side area of Easton to replace the existing cast iron water mains with new 8” ductile iron water mains.  The project will consist of the replacement of the watermains and the replacement or reconnection of the water service laterals.  Existing copper water service laterals will be connected to the new water mains and any lead service laterals that are found will be replaced between the new water main and the curb stop.  Test holes will be excavated on the curb stops in April and May of 2025 to confirm the water service lateral material on both sides of the curb stop.  The project will be bid in the Summer of 2025 with construction anticipated to begin in the Fall of 2025.  Work should be completed in the Spring of 2026.

The work is planned on the following streets:

  • Grant Street (Centre Street to Iron Street)
  • Iron Street (Milton Street to Line Street)
  • Milton Street (Centre Street to Iron Street)
  • Valley Street (Lincoln Street to Line Street)
  • Williams Street (Centre Street to Iron Street)